These services and technologies are essential for operating Herando and enable, for example, security-related functionalities. They also help us recognize whether you want to stay logged in to your profile so we can provide our services more quickly when you visit again.
Without these cookies, the website cannot be operated properly. Therefore, deactivation is not possible.
| Cookie name | Provider / lifetime | Purpose |
|---|---|---|
| herando | Herando / Session | Required so a user can stay signed in. Enables access to protected areas without signing in again. |
| herando-backend | Herando / Session | Ensures authentication in the backend area and access control for protected functions. |
| frontend | Herando / 2 hours | Required to maintain frontend sessions and avoid signing in again. |
| frontend_cid | Herando / 2 hours | Assigns the current session to the consent ID in the frontend area. |
| cc | Herando / 1 year | Stores your cookie consent settings. |
| cid | Herando / 1 year | Stores a unique ID for documenting your cookie consent. |
| _GRECAPTCHA | Google reCAPTCHA / 6 months | Protects the website from automated access, spam, fraud, and abuse. |
Legal basis:
Processing is based on Art. 6(1)(f) GDPR (legitimate interest in secure and functional operation of the website) and § 165(3) TKG (AT) / § 25(2) TTDSG (DE).
To further improve our services, we collect anonymized data for statistics and analysis. Using this data, we can, for example, measure visitor numbers and the effectiveness of specific pages on our website and optimize our content.
Providers:
Google Ireland Limited, Gordon House, Barrow Street, Dublin 4, Ireland
Meta Platforms Ireland Ltd., 4 Grand Canal Square, Dublin 2, Ireland
Purpose:
Analysis of user behavior, reach measurement, content optimization, and evaluation of individual page usage.
Processed data:
IP address (shortened/anonymized), device and browser information, visit duration, page views, interactions, referrer URL.
Legal basis:
Your consent pursuant to Art. 6(1)(a) GDPR in conjunction with § 165(3) TKG (AT) / § 25(1) TTDSG (DE).
Third-country transfer:
Transfer to third countries (e.g. USA) cannot be ruled out. Providers are certified under the EU–US Data Privacy Framework.
Storage period:
Up to 14 months unless otherwise stated.
| Cookie name | Provider / lifetime | Purpose |
|---|---|---|
| _ga | Google Analytics / 2 years | Identifies unique users |
| _gid | Google Analytics / 24 hours | User behavior analysis |
| _gat_* | Google Analytics / 1 minute | Request rate throttling |
| _gat_UA-* | Google Analytics / 1 minute | Controls data transmission |
| OTZ | Google Analytics / 1 month | Aggregated website traffic information |
| AEC | Google / 6 months | Protection against spam, fraud and abuse |
| NID | Google / up to 10 years | Embedding external content (e.g. YouTube) |
You can withdraw your consent at any time via “Cookie settings”.
295.000,00 $
Company Rightboat Ltd
England head office
Fareham Innovation Centre
Merlin House, 4 Meteor Way,
Daedalus Drive
Lee-on-the-Solent PO13 9FU
United Kingdom
www.rightboat.com
| Model | 43Z |
| Boat type | Other |
| Category | Motor Yacht |
| Engines | 1 |
| Engine hours (h) | 1562 h |
| Power (hp) | 480 hp |
| Fuel | Diesel |
| Year built | 2006 |
This is a well maintained Express HT version of the innovative MJM 34z. Her downeast Flag Blue Awlgrip hull is stunning and looks especially nice with the express hardtop. The Express HT is a sleeker profile than the standard downeast version, and offers additional protection for wind and waves. Zest is a great offering and is seriously for sale. All reasonable offers will be considered.
Larger Yanmar 6LY3M-ETP engine 480 horsepower with Electronic engine controls - 1562 hours, regularly serviced Straight Shaft Inboard (most of the other 34zs of this vintage have the smaller Yanmar 440hp engine).
This boat was given a winter makeover with New Cushions in the Salon and Aft Bench. The Teak was refreshened and the hull was polished to a high gloss. With the refreshed helm seats, she looks great!
Northern Lights M673D3 Generator - 447 hours.
Sidepower Bow and Stern Thrusters - all the maneuverability of pods/stern drives/outboards with a much less complex and more reliable drivetrain.
Marine Air HVAC - two units.
The boat will be splashed and in the water just outside of Annapolis, MD by April 7th, 2026.